What should I check at handover?
Start with the documents, because they decide whether the home can be used and registered properly. Then walk through the flat with the contract and the plans in hand. Allow time: a handover that is rushed is a handover where things are missed.
Paperwork to confirm first
Three documents matter most on the day:
- Occupancy permit (iskan): ministry guidance states that buildings without one cannot receive electricity, water, sewerage, telecommunications and similar services. Ask to see it, and check that it covers your building. Our guide to reading and confirming the iskan certificate explains what to look for.
- Title: under the Condominium Law (634), construction servitude becomes full condominium ownership on the basis of an occupancy permit for the whole building. Check whether your unit is already registered as a condominium unit; the public parcel inquiry shows condominium and servitude information, and once you own the unit you can see your record in Web Tapu, which also handles the switch from servitude to condominium.
- Earthquake insurance: the compulsory earthquake insurance (DASK) policy is among the documents listed for land registry procedures for buildings. Keep a copy, note the renewal date, and read our guide to how compulsory earthquake insurance works.
The home itself, room by room
Take the floor plan, the gross and net area table and the schedule of finishes with you, and compare what you see with what the contract describes. A practical order:
- 1Entrance and doors: the front door, locks and every key, intercom, and the doors inside the flat open, close and lock properly.
- 2Windows and balconies: frames, handles and seals; glass without cracks; balcony drainage and railings.
- 3Electrics: every socket and switch, the light fittings supplied, the distribution board labelled, and the meter numbers and readings written down.
- 4Water and heating: run each tap and shower, check drains for leaks, flush toilets, and test the heating and hot water.
- 5Kitchen and bathrooms: fitted units, worktops and appliances supplied under the contract, tiles and silicone joints.
- 6Walls, floors and ceilings: paint, plaster and flooring finished to the schedule; no damp marks or cracks.
- 7Extras in the contract: storage room, parking space or garden area allocated to your unit, and the common areas you will use.
- 8Photographs: take dated photos and short videos of each room and of every item you record.
What goes in the handover report?
The handover report (teslim tutanağı) is the written record of the condition of the home on the day you take possession. It is the document you will rely on later, so make it precise:
- the unit, block and floor, the date and the names of the people present
- meter numbers and readings, and the number of keys and remote controls handed over
- each item that is missing, unfinished or faulty, with its location and a short description
- what the seller will do about each item, and by when
- the documents handed over, such as user manuals and service documents
- signatures of both sides, with a copy for you
What if something is missing?
Record it, and do not sign a report that says everything is in order when it is not. If you bought as a consumer — someone acting for non-commercial, non-professional purposes — the Consumer Protection Law gives you clear remedies. A home is defective if, at delivery, it does not match the agreed sample or model or lacks features it should objectively have, including features stated in its user manual, its advertising or by the seller. Delivery after the agreed date also counts as non-conforming performance.
Where a defect is found, you may choose one of four remedies: withdraw from the contract while offering to return the home, keep it and ask for a price reduction in proportion to the defect, ask for free repair, or, where possible, ask for a defect-free equivalent. For homes and holiday homes, a request for free repair or replacement must be met within 60 working days of reaching the seller; otherwise you may turn to the other remedies.
Time limits matter. Defects that appear within 6 months of delivery are presumed to have existed at delivery, unless that is incompatible with the nature of the home or the defect. Liability for defects in a home is subject to a limitation period of 5 years from delivery, unless the law or the contract sets a longer one, and no limitation applies if a defect was hidden through gross fault or fraud. Disputes can be taken to a consumer arbitration committee or a consumer court.
If you cannot be there in person
You can appoint someone you trust to attend with a written authority, or take part by live video and have the report sent to you for review before it is signed. Either way, insist on a written report and dated photographs. If you are still choosing who to buy from, our comparison of buying from a developer or through an agent explains who is responsible for the handover in each case, and our guide to buying property in Türkiye safely covers the checks that come before it.
Developer's view
As a developer, we build the homes we sell, so handover is the final step of our own work rather than something passed to a third party. We share a sample of the handover report in advance, so you know what will be recorded on the day, and floor plans with gross and net area tables are available on request. At handover you receive the user manuals and service documents, and the site management is already in place.
We are not an estate agency; we only present projects we built, and we also work with estate agencies. If you are abroad, we support the handover by video call. Our campaign ready homes already have full condominium title and an occupancy permit. To arrange a handover or a viewing, get in touch with our team.
Frequently asked questions
- Should I sign the handover report if there are defects?
- Sign only a report that records them. List each missing or faulty item, what the seller will do and by when, and keep a signed copy with dated photographs.
- Can utilities be connected without an occupancy permit?
- No. Ministry guidance states that buildings without an occupancy permit may not receive electricity, water, sewerage, telecommunications and similar services.
- How long can I claim for defects in a new home?
- For homes, the limitation period for defects is 5 years from delivery unless the law or contract sets a longer one, and it does not apply where a defect was hidden through gross fault or fraud.
- What counts as delivery of an off-plan home?
- Under the pre-paid housing regulation, either registration of a condominium unit in your name, or registration with construction servitude together with handing over a home fit to live in.
Official sources
- Ministry of Environment, Urbanisation and Climate Change: building permit and occupancy permit procedures under the Planned Areas Zoning Regulation (checked 20 November 2026)
- Condominium Law No. 634 (Legislation Information System of the Presidency) (checked 20 November 2026)
- TKGM: Parcel inquiry (Parsel Sorgu) — what it is and how to use it (checked 20 November 2026)
- TKGM: Web Tapu — services and how to use it (checked 20 November 2026)
- Investment Office of the Presidency of the Republic of Türkiye — Acquiring Property and Citizenship (checked 20 November 2026)
- Law No. 6502 on Consumer Protection (Mevzuat Bilgi Sistemi) (checked 20 November 2026)
- Regulation on Pre-Paid Housing Sales (Mevzuat Bilgi Sistemi) (checked 20 November 2026)
These links go to Turkish government websites. Rules can change; what counts is the regulation in force on the day you apply.
This guide is general information, not legal, tax or immigration advice. Rules and procedures change; check the current rules with the relevant authority and speak to a licensed lawyer about your own situation.